Reinforced

The new road bridge is open to traffic

Pont routier en béton neuf au-dessus d’une rivière au lever du soleil

The new structure replaces a steel bridge that had become too narrow for today’s traffic.

A three-phase project

Pile foundations, cast-in-place piers, then a deck built by balanced cantilever: every phase was planned in a digital model.

Thank you to local residents for their patience and to the crews for an injury-free project.


Keep reading